Storm Water Station Construction Project - Meydan One

  • Postponed
  • Dubai
  • Sewerage & Wastewater

Construction of a storm water station. The tunnel is 10km long and between 30m and 45m deep. The tunnel has 4 deep shafts which are 14-20m in diameter and 60m deep. The tunnel will be able to drain nearly 40% of the entire urban area of Dubai. The system is designed to manage 6.5m3 liters of water (the equivalent to 2,600 swimming pools). Having a deep tunnel system means gravity does most of the work, requiring only one pumping station making it energy efficient and easy to operate. This project is located at Meydan One in Dubai. Project is expected to be completed in 2021.