Liwa Grid Substation Overhead Line Feeders Construction Project
The project involves construction of 33kv Overhead Line Feeders from Liwa Grid Substation to Liwa and Majees Tapping (North Batinah Governorate) of Oman. The new feeders laying works from existing Liwa Grid Substation to feed new Falaj Al Qubail 3 primary substation at Al Batinah North Governate. primary transmission and secondary transmission and comparatively, essential circulation and auxiliary conveyance and after that at last the arrangement of supply to singular purchasers. A run of the mill format of a creating, transmission and dispersion system of a substantial framework would be comprised of components as appeared by a solitary line chart of Figure 1 despite the fact that it must be understood that at least one of these components might miss in a specific framework. Grid optical medium-voltage and current sensor system uses an all-optical measurement platform for unparalleled accuracy and precision of both voltage and current across multiple voltage classes. Available in a variety of easy-to-install packages with a standardized interface, EatonÂ’s optical sensors are the ideal solution to retrieve real-time site metrology and intelligence on todayÂ’s electrical distribution system, substations and underground distribution locations. Evaluation Type: Schedule Wise Procurement Category: Construction Works Procurement Sub Category Names: Electrical works - DCRP Vendor Grades: Excellent, First, Second, Third, Fourth PreBid Clarification: Online Governorate: Al Batinah North Wilayat: Liwa Envelope Type: Single Envelope .