Construction of Two 380kV double circuit OHTL between new Al Rass PV BSP 9095 and Qassim-2 BSP 9025, Dawadmi BSP 9037'. The project involves the design and construction of 380kV OHTL to connect the new ArRass PV BSP with the network. Approximate route length of total OHTL route is 37km.