Note: For exact Project GPS coordinates, please contact the client.
Chilled Water Pipe Network Project - Dubai Creek Harbour (Phase 1)
Well-controlled cooling systems are crucial in maintaining a good indoor climate and low operation costs. Variable Primary Flow (VPF) systems are world champions in achieving this. But to avoid chiller freezing and tripping, a minimum flow through the chiller must be maintained and the system must have quick unloading capabilities. This can be achieved with a precise control system, variable capacity compressors, pumps and fans, and a well-controlled bypass line. This project will be located at Dubai Creek Harbour (Phase 1). The project comprises the construction of approximately 6km of hybrid gravity concrete block / rock revetment quay wall at the Docklands Advanced Promenade and Phase 1 (Marine 1a and Harbour Point) precincts respectively. The project is being executed in close proximity to ongoing land based developments which requires close coordination with a number of contractors and an approach that minimizes interface risk. Local Construction Engineering Company has been appointed as the main contractor.
