Note: For exact Project GPS coordinates, please contact the client.
Bul Hanine Offshore Oilfield Re-development Project
This project involves re-development of the Bul Hanine offshore oilfield located about 120 kilometres to the east of the east of the coastline, Bul Hanine Al Wakrah in Qatar. The project involves the redevelopment of Bul Hanine offshore oil field to double its current oil production rate from 45,000 barrels per day (bpd) to 90,000 bpd. It is being undertaken to raise efficiency of producing fields as well as the implementation of various well drilling programs to increase crude oil reserves. The Bul Hanine redevelopment project involves both offshore and onshore facilities that include new central production facilities and a onshore gas liquids processing facility at Mesaieed. A total of 150 new wells are planned to be drilled by 2028 from both existing and new well-head jackets. Modification work will be carried out on the existing wellhead jackets for the excavation of new wells, in addition to installing 14 wellhead jackets. An offshore central complex consisting of production, compression, utility and living quarter platforms will be installed. Fluids obtained from the wellheads will be processed at the complex. Topsides will weigh between 4,000t and 14,000t. The scheme is currently in engineering and design stage.
