Please help us to correct the information by filling the below form.
Al Ittihad Bridge / Dubai Smile Project
Cancelled
Dubai
Roads & Infra
This project is also known as Al Ittihad Bridge/Dubai Creek Seventh Crossing. It involves construction of the seventh crossing across Dubai Creek. The crossing is located near Dubai Creek Park, Wonderland and Dubai Courts on the Bur Dubai side, and Deira City Centre and Dubai Golf Club on the Deira side. It will replace the temporary Floating Bridge. The crossing consists of 12 lanes (6 lanes in each direction) and a footpath in each direction. The width of bridge will be about 61.6 metres and the arch will rise to 100 metres. The bridge can accommodate around 24,000 vehicles per hour. It shall rise 15 metres above the water level of the Creek. Width of the waterway is 400 metres. On the Bur Dubai side, the bridge would also connect with a new underpass near Rashid Hospital, while on the Deira side the bridge would be linked with Al Ittihad Road for motorists travelling to Sharjah.
Looking to get more information about this Project?
1
Consultant
2
Contractors
16
KeyUpdates
We can help you get detailed information and analytics from concept stage to execution and completion with Information related to Clients, Consultants, Contractors and projecttimeline.
}
Contact US to see how we can help you identify more Projects Leads, Shorten Sales Cycles and improve Win Rates.