logo
Back
The above coordinates indicated the country location for the project.
Note: For exact Project GPS coordinates, please contact the client.

Substations Construction Project - Qatar Power Transmission System Expansion - Phase 12

  • OnGoing Project
  • Qatar
  • Power and Energy

This project is in Qatar and is part of Phase 12 of the power transmission expansion. Design, engineering, supply, installation and commissioning of (14) new substations, including extension of four existing substations. Scope of work encompasses the design, engineering, supply, installation and commissioning of (14) new substations for the 400kV, 132kV, 66kV and 11kV voltage levels, including switchgear, transformers, control and protection equipment, as well as the extension of four existing substations. Germany's Siemens has been awarded the main contract for the (18) turnkey substations, worth $523 million. The substations are required to supply power for ongoing infrastructure development projects, schools, hospitals and residential complexes.

Looking to get more information about this Project?