Latest Airport and aviation technologies. Projects & Tenders Check Sample Info
Post/ Updated Description Territory Status
September 3, 2015 Carrying out expansion of an existing passenger terminal building at an international airport. United Arab Emirates New Tender
September 3, 2015 Supply of Aircraft Kits and Equipment United Arab Emirates New Tender
September 2, 2015 Development of the two onshore Khazzan and Makarem gas fields covering 2,800 square kilometres involving exploration of at least 7 wells for full reserve determination and production facilities. Oman Current Project
September 2, 2015 Provision of Oman Air Primary Data Center Enhancement. Oman New Tender
September 2, 2015 Engineering, procurement and construction (EPC) contract to build a new terminal at Muscat International Airport with capacity to handle 36 million passengers a year, including a runway, taxiway system, aprons, roads, utility buildings and other civil works. Oman Current Project
September 1, 2015 Provision of Consultancy Services for MRO Project Oman New Tender
August 30, 2015 Construction of a 1.1-kilometer-long terminal building comprising six floors, including a luxury hotel and spa, duty free area, restaurants, executive lounges and an indoor car park area. United Arab Emirates Current Project
August 25, 2015 Design, construction and operation of an International Airport. Saudi Arabia New Tender
August 25, 2015 Provision of Calibration for Air Navigation Aid Equipment Oman New Tender
August 24, 2015 Provision of Cleanliness Works at an Airport and its Facilities. Kuwait New Tender
August 24, 2015 Design and construction of a new Airport Terminal comprising 30 to 51 gates, a transit hotel, VIP and first-class lounges as well as car parking for (4,500) vehicles. Kuwait Current Project
August 20, 2015 Provision of Flight Calibration Mission for the Navigational Aids Oman New Tender
August 20, 2015 Supply of Non-Motorized Passenger Steps and Conveyor Belts Oman New Tender
August 20, 2015 Construction of a new airport terminal. Iran New Tender
August 20, 2015 Transportation of Navigators. Saudi Arabia New Tender
August 19, 2015 Development of an Airport City comprising a free zone, cargo facilities and residential communities. Iran New Tender
August 18, 2015 Design, construction and upgrading of Musandam Airport. Oman New Tender
August 16, 2015 Construction of an Advanced Military Maintenance Repair & Overhaul Centre (Ammroc), which will be used to repair fixed-wing and rotary-wing aircraft for the military, together with other support buildings. United Arab Emirates Current Project
August 13, 2015 Modifications to Gulf Air Parking and Shading. Bahrain New Tender
August 11, 2015 Provision of international medical air and private air transportation services. United Arab Emirates New Tender
August 9, 2015 Carrying out Expansion of Bahrain International Airport. Bahrain New Tender
August 4, 2015 Provision of consultancy services Kuwait New Tender
July 30, 2015 Space Planning, Design, Supply & Installation of Bench Seating for Gate Lounges and Public Areas. Oman New Tender
July 19, 2015 Carrying out expansion of an international airport with capacity to handle in excess of 200 million passengers and over 12 million tonnes of cargo per year. United Arab Emirates Current Project
July 15, 2015 Carrying out expansion of Bahrain International Airport to increase capacity to 13 million passengers a year from the current 9 million passengers. Bahrain New Tender
July 15, 2015 Construction of new Concourse at an International Airport. United Arab Emirates Current Project
July 9, 2015 Construction of a new domestic airport that will increase capacity to accommodate 3 million passengers a year. Saudi Arabia Current Project
July 8, 2015 Construction of an Aircraft Hangar covering an area of 18,000 square metres at an international airport. United Arab Emirates Current Project
July 6, 2015 Carrying out expansion of King Khalid International Airport, with capacity to handle 20-25 million passengers per year. Saudi Arabia Current Project
July 6, 2015 Design and Build (DB) contract for the expansion of Terminal 1, 2, 3 and 4, including additional land side work and concourses at an international airport. Saudi Arabia Current Project
June 15, 2015 Carrying out expansion of an existing domestic airport. Saudi Arabia Current Project
June 1, 2015 Construction of a passenger terminal building, a cargo terminal and other buildings. Oman Current Project
May 28, 2015 Carrying out expansion of an existing airport with the addition of a new terminal building comprising a ground floor and an additional floor, including the construction of a new runway and taxiway. Oman Current Project
May 28, 2015 Carrying out expansion works at an existing domestic airport involving construction of a new terminal and related airport infrastructure. Saudi Arabia Current Project
May 27, 2015 Construction of a VIP Completion Center providing enhanced and customized services to VIP customers, featuring a state-of-the-art hangar equipped to accommodate up to an Airbus A380, in addition to VIP lounges, workshops, offices and an in-house design studio for elite clientele. United Arab Emirates Current Project
May 25, 2015 Carrying out major expansion of a runway at an International Airport. United Arab Emirates New Tender
May 18, 2015 Construction of a new aircraft hangar at an airport. United Arab Emirates New Tender
May 11, 2015 Carrying out development and rehabilitation of an Airfield. United Arab Emirates Current Project
May 7, 2015 Construction of a new Terminal comprising dedicated facilities for customs, immigration and police, separate drop-off and executive lounge areas to ensure full privacy, as well as walkable, direct access to the apron. United Arab Emirates Current Project
May 3, 2015 Expansion of King Abdulaziz International Airport involving construction of two new passenger terminals, passenger gangways, car parks, etc. Saudi Arabia Current Project
April 21, 2015 Carrying out expansion of an International Airport to increase capacity from 8.5 million passengers a year to 25 million passengers a year. United Arab Emirates New Tender
April 13, 2015 Carrying out expansion of the Abha regional airport, which will have an annual capacity of five million passengers. Saudi Arabia Current Project
April 8, 2015 Construction work for the expansion of A380 stands/gate room at an international airport. United Arab Emirates Current Project
April 8, 2015 Expansion and renovation of a domestic airport with capacity to accommodate 140,000 passengers per year. Saudi Arabia Current Project
April 8, 2015 Construction of maintenance, repair and overhaul (MRO) facility at King Abdulaziz International Airport. Saudi Arabia Current Project
April 7, 2015 Construction of an aviation center comprising a ground floor and 3 additional floors. United Arab Emirates Current Project
April 1, 2015 Engineering, procurement and construction management (EPCM) contract to build a new airport on a 22 square kilometre site, including runways, terminal building, remote gates, a 100-room hotel, an aircraft maintenance centre, a 750,000-tonne-a-year cargo terminal, a free trade zone and business park; and an airline headquarters building and training facility, including dredging and reclamation works. Qatar Current Project
March 25, 2015 Construction of King Abdullah Bin Abdulaziz Airport comprising a three-storey passenger terminal, a control tower, air cargo zones and other facilities. Saudi Arabia Current Project
February 11, 2015 Construction of a new Air Force Life Cycle Management Center at an Air Base. Saudi Arabia Current Project
January 28, 2015 Development of a new Cargo Terminal covering a gross floor area of 400,000 square meters. United Arab Emirates New Tender
These are the latest 50 records based on your Trade Category. Subscribe Now and View all the Records
Featured Search Links :
Links :