Department of Municipal Affairs - Abu Dhabi Municipality, Roads & Transport Authority (RTA) - Dubai, Public Works Department (Abu Dhabi), Dubai Municipality, Department of Transport (Abu Dhabi), Ministry of Public Works (Abu Dhabi), Ministry of Public Works (Dubai), Supervision Committee for the Expansion of Abu Dhabi International Airport (SCADIA), Dubai Electricity & Water Authority (DEWA), Tourism Development & Investment Company - TDIC (Abu Dhabi)
Latest Projects & Tenders Check Sample Info
Post/ Updated Description Territory Status
April 8, 2020 Construction of internal roads & infrastructure. Abu Dhabi Current Project
April 8, 2020 Construction of two flyover bridges, a one-lane ramp and a two-lane tunnel. Dubai Current Project
April 8, 2020 Construction of a park spread over 200,000 square meters, including landscaping, internal roads, pipelines and infrastructure work. Abu Dhabi Current Project
April 7, 2020 Provision of Asphalt Fissures in Al Ain and its Suburbs. Al Ain New Tender
April 7, 2020 Construction of Public Realm in roads and corridors drop-offs. Dubai Current Project
April 7, 2020 Provision of Raising the Efficiency of Roads and Infrastructure in Al-Yahar - Contractor. Al Ain New Tender
April 6, 2020 Provision of Urban Road Maintenance in Al Ain 2020 Contract 2. Al Ain New Tender
April 6, 2020 Construction of a 300-meter-long, 22-meter-wide signature bridge, as well as a 15-meter-deep underpass. Dubai Current Project
April 6, 2020 Construction of an access road and street upgrade works. Dubai Current Project
April 6, 2020 Improving Pedestrian and Counterfeit Safety. Al Ain New Tender
April 5, 2020 Construction of a 200 kilometre railway line of mainline plus 40km branch line to Khalifa Port. Abu Dhabi Current Project
April 5, 2020 Construction of a 628-kilometer-long railway network. Abu Dhabi Current Project
April 5, 2020 Construction of the central Operation and Maintenance (O&M) facility. Abu Dhabi Current Project
April 3, 2020 Provision of works for Transportation of FGC Rotor Assembly from Dubai to Hiroshima, Japan on door-to-door basis by Air for "H" Station,Phase-1. Dubai Completed Tenders
April 2, 2020 Carrying out double-decking/elevating of a Road. Dubai New Tender
March 31, 2020 Construction of Roads. Dubai Current Project
March 30, 2020 Supply of Tensator TD300 Rolls. Dubai Completed Tenders
March 29, 2020 Construction of an Autodrome. Dubai Current Project
March 29, 2020 Construction of a structure between the two existing bridge spans. Abu Dhabi New Tender
March 27, 2020 Abu Dhabi Logistics and Transportation Services for Events. Abu Dhabi Completed Tenders