logo
Back
The above coordinates indicated the country location for the project.
Note: For exact Project GPS coordinates, please contact the client.
Are you Interest to View Complete Information for the below Project?
Download Complete Project Information

Proceed to request complete Project Information and understand how you can you help grow your business.
Our team will be in touch to help you make the most of the information provided.

Wahat Al Zaweya Villas (Aryaf) Project - Shebibi Precinct

  • Completed
  • Al Ain
  • Urban Construction

The Wahat Al Zaweya (Aryaf) villas will be located within Shebibi Precinct in Al Ain. The project is about Construction of (217) residential villas, each comprising two floors. Out of the (217) villas, (165) villas will comprise three bedrooms; while the remaining (52) villas will consist of four bedrooms with Majlis and swimming pool. This project allows for the natural growth of the city, ensuring the economic success and vitality of the area. With extensive strategic planning, unique cultural values, heritage and the sentiment of the creek experience were sensitively addressedThe project will be surrounded with a normal compound wall spanning 21 kilometers and a decorative compound wall spanning 7,500 Lm. Aryaf is a range of 213 residential villas located in the Maraha Al Zaweya phase of the magnificent Wahat Al Zaweya master development in Dubai-Al Ain Road. Each villa has two floors with an innovative design that allows the homes to be expanded in the future, depending on the ownerÂ’s preferences. Aryaf Villas ensure that each living space suits the needs and taste of its future residents. The villas are exclusively for Emiratis and are offered in 3-bedroom and 4-bedroom arrangements suitable for different family sizes. The eco-friendly location of Aryaf Villas allow residents to connect to nature. The residential project also promotes smart energy usage to preserve the environment. Local Bin Ham Engineering Projects has been appointed as the main contractor. Scope of work involves construction, completion and remedying of defects for the proposed (217) villas along with structural and architectural works, electrical works, as well as mechanical, testing and commissioning works. Footing works for villas have commenced. The development is expected to be completed by December 2019. Client Contact name has not been revelled.

Looking to get more information about this Project?