Zirku Oil Processing Facilities Expansion Project

  • Completed
  • Abu Dhabi
  • Gas Processing, Oil & Gas

This project is at Zirku Island, 140 kilometres northwest of Abu Dhabi. Scope of work involves the development of two new crude processing trains. The project will meet with the additional oil and gas production to come from the Upper Zakum further development project called UZ750 by reference to the 2017 production target. Zakum Development Company (Zadco) plans to extend its upper Zakum oil preparing offices at Zirku Island, Abu Dhabi, UAE. The venture us a player in ADNOC's long haul technique to increment and support Abu Dhabi's oil generation limit by 2017 and goes for verifying the creation supportability through progressive change to the islands. The undertaking at Zirku will incorporate two oil preparing trains which are fifth and sixth train. The undertaking will likewise incorporate gas focal handling offices. This undertaking is a piece of Zadco's arrangement to continuously build the generation limit of its preparing offices from 580,000 bpd to 1 million bpd. The venture is isolated into 2 stages. The principal period of the task includes the advancement of the seaward offices. It incorporates the laying of 240 Km of sub-ocean pipelines, 128 Km of sub-ocean composite and fiber-optic links and introducing 30,000 t of seaward structures, for example, coats, riser stages, flare towers and connects, and around 3,000 t of islands modules and scaffolds. The scheme is currently under study.