Note: For exact Project GPS coordinates, please contact the client.
Wind Farm Construction Project
This project is about Engineering, Procurement and Construction (EPC) contract to build a wind farm with combined capacity of 120MW in Egypt. Design, manufacturing, implementation and construction till operation of a turnkey wind farm at Gulf of Zayt on the Red Sea Coast, financed by both Egypt & Spain. Bid Bond: EURO 250,000. The project, which is one of the biggest breeze cultivates in Egypt, is financed by delicate ODA Loans from Japan International Cooperation Agency (JICA) measuring 350 Million USD comparable with the target of expanding electric power supply and sparing non-renewable energy source utilization, along these lines adding to satisfaction of interest for power, to moderation of environmental change through the decrease of ozone depleting substance discharge, and to monetary and social advancement just as conservation of the earth in Egypt. This power plant, which is situated in the Gulf of El Zayt locale along the Red Sea coast, 350 kilometers southeast of Cairo, is required to spare carbon dioxide outflows by around 494,000 tons for each year when contrasted with a proportionate amount of intensity created with non-renewable energy sources, which is steady with the arrangement of the Egyptian Government as pronounced in the SDS 2030 just as the bearing of the Government of Japan to add to the environmental change alleviation all inclusive. The project is implemented in collaboration with the Ministry of Electricity and Renewable Energy, and New and Renewable Energy Authority.