logo
Back
The above coordinates indicated the country location for the project.
Note: For exact Project GPS coordinates, please contact the client.

Parallel Roads Improvement Project - Phase 3C2 - Business Bay

  • Completed
  • Dubai
  • Roads & Infra

This project is in the Business Bay area of Dubai - Phase 3C2, Contract No. (R881/3C2) - Comprehensive Improvement of Parallel Road. The project is about Construction of roads, bridges and underpasses to ease traffic flow on the Parallel Roads, which will reduce traffic snarl-ups in neighboring and surrounding roads. The scheme is a continued extension of Al Asayel Street (D72) and First Al Khail Street (D86), as well as the updating improvement of Al Yalayis Street between Mohamed Bin Zayed Street and Sheikh Zayed Street. This stretch of Al Yalayis Street is intersecting with both Parallel Roads. The scope includes construction of 6.4 kilometers of roadways for Al Yalayis Street, Al Asayel Street and First Al Khail Street. The two intersections configuration contains evaluated signals and second level bridges for the left turn movement (Southeast direction) with a total length of 620 meters for each directional bridge. The Parallel Roads venture is being built in stages. The main stage incorporated the Al Barsha and Al Qouz modern and neighborhoods and spreads Hissa Road in the south and Meydan Road in the north. It expands 15km on the Eastern Parallel Road and 18km on the Western Parallel Road, involving three paths with expressways at convergences that incorporate the Umm Suqeim Road and Latifa Bint Hamdan Road, just as 25 intersections with signs. Stage II included streets in the Business Bay region arranged between the Financial Center Road toward the north, Meydan Road toward the south, Al Khail Road toward the east, and Sheik Zayed Road toward the west. It likewise includes a street estimating 16km, a 600m-long scaffold, seven light flags, and a tempest water waste system. Stage III (A) comprises of a 10km-long street with three paths toward every path. It likewise has three paths toward every path. Stage III (B) is comprised of a 20km street which established 14% of the whole undertaking. Stage IV incorporates the improvement of the Al Khail street by extending the street from four paths to six to permit smooth development of traffic between Al Khail and Emirates streets. Two round crossing points at Al Khail street, including lanes 319 and 323 at Al Quoz Industrial region and Interchange 13, will likewise be supplanted. The Sheik Zayed Interchange will frame the last period of the undertaking. Client has invited companies to submit bids for the main contract. Client Contact name has not been revelled. US-International has been appointed as the consultant.

Looking to get more information about this Project?