logo
Back
The above coordinates indicated the country location for the project.
Note: For exact Project GPS coordinates, please contact the client.

Nawaseeb Road Upgrade Project

  • OnGoing Project
  • Kuwait
  • Roads & Infra

This project involves upgrading of Nawaseeb Road in Kuwait. The project is about Carrying out reconstruction and expansion of a 42-kilometer-long road to create a six-lane highway with five interchanges, three bridges and grade-separated u-turns. The goal was to improve access and safety on the roads, therefore the Nawaseeb Road corridor is upgraded to provide free flow by eliminating all existing U-turns and exchanging them into new roundabouts at all interchanges. This includes 18 elevated three lane bridges and 1 elevated two lane vehicular flyover. All these comprise 13 km of motorway on reinforced earth ramps and pertaining retaining walls. 4 elevated Camel Crossings with 3 km of roadways on reinforced earth ramps and associated retaining walls complete the project. Eight bridges out of nine are designed using precast concrete T-beams, which are manufactured at a special production site beside the road and not far from the respective construction sites. The ninth bridge is a combination between precast concrete T-beams and cast in-situ box girders.8 bridges out of 9 are designed using precast concrete T-beams manufactured at a special production site alongside the road and not far from the construction sites. The ninth bridge is a combination of precast concrete T-beams and cast in-situ box girders. The precast elements are produced by Arab Contractors, a leading construction company in the Middle East and Africa, and an expert in a widely diversified field within the construction industry. Its projects include public buildings, bridges, roads, tunnels, airports, housing, water & sewage projects, wastewater treatment plants, power stations, dams, hospitals, sports buildings, restoration of monuments, irrigation, producing ready-mix concrete, shipbuilding, electro-mechanical projects, engineering consultancy, manufacturing and assembly of steel structures.The goal was to refurbish and reconstruct Al Nawaseeb Road so as to improve access and safety on the roads: The Nawaseeb Road corridor is upgraded to provide free flow traffic by eliminating all existing U-turns and changing them to new roundabouts at all the interchanges.

Looking to get more information about this Project?