Note: For exact Project GPS coordinates, please contact the client.
Central Processing Facility Construction Project (Phase 2) - Majnoon Field
This project is at the Majnoon field in the South of Iraq. The project is about Engineering, procurement and construction (EPC) contract to build a central processing facility (CPF) at an oil field to double the production capacity to 400,000 barrels a day (b/d) from the current level of 200,000 b/d. The venture includes the development of another generation stage to support yield at the Majnoon oilfield arranged in southern Iraq. The principle objective is to build creation at its giant oilfield. Amid our oil generation from Majnoon related gas is additionally being delivered which as of now is flared because of an absence of foundation to treat and process it. This speaks to an enormous money related misfortune for Iraq and is a squandered resource.In reaction to this issue Shell is actualizing a specialized arrangement with our accomplices Ministry of Oil and South Oil Company to catch however much first stage related sweet gas as could be expected, delivered from field, to add new influence to the network while emphatically affecting the earth by lessening flaring all the while. Majnoon has roughly 13 distinct stores with the possibility to deliver oil and gas. EPC contract is expected to be tendered by the end of 2012. Client is expected to tender three further contracts, which include: - Construction and installation of a 160-kilometre, 42-inch crude oil export pipeline from field to the Al-Fao storage facility. - Storage tanks and a tank farm. - Enabling and civil works including roads and flyovers.