logo
Back
The above coordinates indicated the country location for the project.
Note: For exact Project GPS coordinates, please contact the client.
Are you Interest to View Complete Information for the below Project?
Download Complete Project Information

Proceed to request complete Project Information and understand how you can you help grow your business.
Our team will be in touch to help you make the most of the information provided.

Al-Sharqiyah Water Transmission System Reinforcement Project

  • OnGoing Project
  • Oman
  • Water

This project is at Oman. The project is about Reinforcement of a Al-Sharqiyah Water Transmission System. This incorporates the laying of a principle pipeline with a length of around 145 km and distances across running somewhere in the range of 1000 and 1400 mm, and optional pipelines with an absolute length of about 5.5 km and a measurement of around 600 mm, just as the expanding of the limit of the current Al Kamil water siphoning station to around 1070 m3/hour and the development of 8 new water siphoning stations with limits going between around 840 m3/hour and 3580 m3/hour each. This likewise incorporates the development of 4 repositories with limits running between 10000 m3 and 80000 m3 each, and the arrangement and establishment of the vital hardware and supplies for the assurance and activity of the transmission lines, and the control of the siphoning stations. The undertaking goes for confronting the ebb and flow deficiency in gathering the interest for drinking water, and the expanding future needs in North and South Ash Sharqiyah governorates. This will be accomplished through the laying of transmission lines to move desalinated water, accessible from the as of late extended Al Sur plant, and from the Al Ashkhara plant, which is relied upon to be finished in the year 2020, to give all states in both Ash Sharqiyah governorates with drinking water up to the year.The task, which is relied upon to be finished in the second quarter of 2022, comprises of the laying of pipelines, the development of water repositories, the expansion of the limit of various existing water siphoning stations and the development of new stations, including the works required to furnish these stations with power, just as all thoughtful, hydro mechanical and electrical works, and the foundation of the essential observing and control frameworks in the venture offices and their activity. The venture likewise comprises of the required specialized administrations to set up the examinations, structures and works supervision.

Looking to get more information about this Project?