logo

Construction Technology & Building Material Projects Tenders in Abu Dhabi, Dubai, UAE

Construction Technology & Building Material Projects Tenders in Abu Dhabi, Dubai, UAE

List of major player and key clients related to Construction Sector in Abu Dhabi, Dubai, UAE
Ministry of Public Works (Dubai), Department of Finance - Administration of Commercial Buildings (Abu Dhabi), Public Works Department (Abu Dhabi), Department of Municipal Affairs - Abu Dhabi Municipality, Ministry of Interior (Abu Dhabi), Department of Municipal Affairs - Al Ain Municipality, Abu Dhabi Police General Headquarters, Ministry of Public Works (Abu Dhabi)

Latest Projects & Tenders Check Sample Info
Post/ Updated Description Territory Status
May 25, 2017 Construction of a twin tower comprising (52) floors and (47) floors offering a total of (450) residential apartments of one, two and three bedrooms, including townhouses as well as other amenities such as a gymnasium, a swimming pool and retail center. Dubai Current Project
May 25, 2017 Construction of a four-star hotel and serviced apartments comprising (54) floors featuring a total of (534) rooms. Dubai New Tender
May 25, 2017 Construction of a twin tower complex comprising (250) rooms and (200) serviced apartments. Dubai New Tender
May 25, 2017 Construction of a plaza, home to various events throughout Expo 2020 and connecting the three thematic districts as well as the other main concourses, including the Dubai Metro link and the UAE Pavilion. Dubai New Tender
May 25, 2017 Provision of Cleaning Services at Power Stations and Solar Test Facility. Dubai New Tender
May 25, 2017 Supply of Precast Concrete Benches Dubai New Tender
May 25, 2017 Construction of a hotel apartments building comprising 3 basement levels, a ground floor, (7) additional floors and a roof. Dubai Current Project
May 25, 2017 Design and construction of 3D Printed Laboratory Building. Dubai Current Project
May 25, 2017 Design and build (DB) contract for the construction of Terminal 4, including 400 metres of quay wall along with 420-metre bridge and causeway at Jebel Ali Port. Dubai Current Project
May 25, 2017 Construction of a residential building comprising a basement, ground floor and (7) floors. Dubai Current Project
May 25, 2017 Construction of a residential tower comprising two basement levels, five parking levels and (36) floors featuring luxurious apartments and duplexes with necessary amenities, including a fitness center, swimming pools, children's play area, multipurpose room and parking spaces. Abu Dhabi New Tender
May 25, 2017 Construction of an ultra-luxury resort comprising (350) hotel rooms with panoramic beachfront views, including recreational marine facilities that encompass spas, health clubs, elevated tennis courts, a world-class sports complex and a range of ocean-facing retail, food and beverage outlets. Dubai Post Poned
May 25, 2017 Construction of a Commercial and Residential Building comprising 3 basements, a ground floor, mezzanine floor and (18) typical floors plus roof. Abu Dhabi Completed Project
May 25, 2017 Construction of a tower comprising five-star luxury furnished serviced apartments. Dubai New Tender
May 25, 2017 Construction of 3 towers of (25) floors each with dedicated 2-bedroom, 3-bedroom and 4-bedroom apartments comprising 4 dedicated residential basement parking and 3 upper level parking for retail clients. Abu Dhabi New Tender
May 25, 2017 Construction of a high-rise residential tower comprising (29) floors offering (456 Nos.) fully furnished apartments. Dubai New Tender
May 25, 2017 Development of a mixed-use scheme offering (234) residential units as well as (217) furnished and serviced hotel apartments ranging from studios to 2-bedroom apartments, including and a wide variety of commercial, leisure facilities and retail outlets. Abu Dhabi Current Project
May 25, 2017 Construction of a residential building comprising a basement, ground floor and (12) floors offering an innovative selection of spacious studio, one and two-bedroom apartments, with recreational facilities located at the rooftop level, featuring a swimming pool, bathing deck, gymnasium, sauna and steam room. Dubai Current Project
May 25, 2017 Construction of a headquarters building spanning 7,000 square meters. Sharjah Current Project
May 25, 2017 Development of Eagle Heights residential tower comprising (2) basement levels, a ground floor, (14) additional floors, a gymnasium and a roof. Dubai Current Project
These are the latest 20 records based on your Trade Category. Subscribe Now and View all the Records